Overview
Project Description
The LAX 2017 Airline Relocation Enabling Project, was planned to allow the relocation of our Owner from Terminals 5 & 6 to Terminals 2 & 3. Additionally, the thirty-two (22) airlines occupying Terminals 2 & 3 were to be moved to Terminals 5 & 6 concurrent with our Owner. This was the largest airline relocation in aviation history.
Services Provided
- Prolégo’s primary role as Owner’s Representative included:
- Expansion of Existing Terminal 2 CBIS
- Install (2) Inbound Transfer Load Positions
- Install (1) FIS Claim Unit
- New T3 Outbound Make-Up Unit for Other Airlines
- BHS Server Update for Common Use Infrastructure
- Re-Control of T3 Upper Level Controls
- Install (1) Terminal 3 Outbound Transfer Pier
- Modify (2) T6 Existing Inbound Conveyor
- Re-Route T6 Ticketing Conveyor to Terminal 5
- Demolition of T5 Conveyor
- T2 & T3 RFID Installation
Details
Location
Los Angeles, California
Project Duration
24 Months
Market Sector
Aviation