Overview

Project Description

The LAX 2017 Airline Relocation Enabling Project, was planned to allow the relocation of our Owner from Terminals 5 & 6 to Terminals 2 & 3. Additionally, the thirty-two (22) airlines occupying Terminals 2 & 3 were to be moved to Terminals 5 & 6 concurrent with our Owner. This was the largest airline relocation in aviation history.

Services Provided

  • Prolégo’s primary role as Owner’s Representative included:
  • Expansion of Existing Terminal 2 CBIS
  • Install (2) Inbound Transfer Load Positions
  • Install (1) FIS Claim Unit
  • New T3 Outbound Make-Up Unit for Other Airlines
  • BHS Server Update for Common Use Infrastructure
  • Re-Control of T3 Upper Level Controls
  • Install (1) Terminal 3 Outbound Transfer Pier
  •   Modify (2) T6 Existing Inbound Conveyor
  • Re-Route T6 Ticketing Conveyor to Terminal 5
  • Demolition of T5 Conveyor
  • T2 & T3 RFID Installation

 

 

Details

Location

Los Angeles, California

Project Duration

24 Months

Market Sector

Aviation