Overview
Prolégo’s role on Phase I was the oversight of design and construction of the following scope of work:
- Modify the existing building to accommodate modifications to the existing Baggage Handling System (BHS) Sortation System
- Relocation of existing electrical corridor
- Construction of a new power station
- Installation of new ramp/runway lighting
- Installation of new IT Backbone system
- Construction of new IT Rooms
Prolégo is the Program Manager on the AAA Program Management Office (PMO) team to provide the following services:
- Assist AAA team through the design process. Make recommendations to the AAA Program Management Office (PMO) for design compliance to TSA’s PGDS, and US-CBP requirements.
- Assist AAA in the development of a 30% design build tender packages.
- Oversight of the RFP process to choose the right BHS contractor for the program.
- Work with AAA and the selected Baggage Handling System Contractor (BHSC), during the design submittal phase (30% to 100% construction documents) to ensure the system design meets AAA operational needs and the requirements of TSA and US-CBP.
- Assist AAA in the development of an O&M program for the BHS/CBIS system, including identifying staffing requirements.
Details
Location
Oranjestad, Aruba
Project Duration
26 Months
Market Sector
Aviation