Prolégo’s role on Phase I was the oversight of design and construction of the following scope of work: Modify the existing building to accommodate modifications to the existing Baggage Handling System (BHS) Sortation System Relocation of existing electrical corridor Construction of a new power station Installation of new ramp/runway lighting Installation […]
Project Description The LAX 2017 Airline Relocation Enabling Project, was planned to allow the relocation of our Owner from Terminals 5 & 6 to Terminals 2 & 3. Additionally, the thirty-two (22) airlines occupying Terminals 2 & 3 were to be moved to Terminals 5 & 6 concurrent with our Owner. […]
The MSP Terminal 1 BHS Re-Control Project was planned to upgrade outdated BHS Servers, PLCs and improve BHS operations. The work required Prolégo to coordinate with multiple stakeholders and airport authority. Required upgrades and new additions to the existing BHS did not interfere with ur owner or other airline operations. Prolégo […]